  "as_of": "2026-09-17",
  "method": "Original currencies/vintages retained. Nulls are unresolved, never zeros. No all-technology ranking implied.",
  "observations": [
    {
      "id": "pv-roof-1",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 2497,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": "2–10",
      "sample_n": 408,
      "min": 852,
      "q1": 2096,
      "q3": 3114,
      "max": 6635,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "pv-roof-2",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 1911,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": "10–30",
      "sample_n": 907,
      "min": 561,
      "q1": 1659,
      "q3": 2237,
      "max": 5113,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "pv-roof-3",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 1428,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": "30–100",
      "sample_n": 141,
      "min": 434,
      "q1": 1125,
      "q3": 1751,
      "max": 3774,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "pv-roof-4",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 1102,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": "100–300",
      "sample_n": 88,
      "min": 465,
      "q1": 907,
      "q3": 1597,
      "max": 3353,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "pv-roof-5",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 800,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": "300–1000",
      "sample_n": 47,
      "min": 461,
      "q1": 705,
      "q3": 1010,
      "max": 1589,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "pv-roof-6",
      "technology": "rooftop PV",
      "metric": "median installation quote/invoice price",
      "value": 660,
      "unit": "CHF/kWp",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "nominal 2025; excludes VAT; no subsidy deduction applied here",
      "geography": "CH",
      "status": "survey of offers and invoices; not exclusively audited outturns",
      "reporting_period": "2025",
      "source_ids": [
        "bfe-pv-price-2025"
      ],
      "locator": "Table 4 printed/PDF p.17; scope pp.7–9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Installer scope through building grid disconnector",
      "omissions": [
        "external design",
        "roof renovation/structural reinforcement",
        "network strengthening",
        "storage",
        "finance",
        "lifetime operation/replacement"
      ],
      "uncertainty": "Q1–Q3 is middle half of observations, not confidence interval. Eastern/central Switzerland underrepresented; possible duplicate offers. Largest class n=7.",
      "comparability": "Comparable within this roof survey; not ground-mounted or alpine EPC quotations",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_band_kwp": ">1000",
      "sample_n": 7,
      "min": 528,
      "q1": 602,
      "q3": 772,
      "max": 927,
      "source_dates": [
        {
          "source_id": "bfe-pv-price-2025",
          "publication_date": "2026-08-03",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-17T01:55:53.593929+00:00"
        }
      ]
    },
    {
      "id": "ebp-agri-PV",
      "technology": "agri-PV",
      "metric": "reference investment assumption",
      "value": 2210,
      "unit": "CHF/kW",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "literature and expert-interview model input",
      "reporting_period": "December 2024 report; inputs from multiple earlier years",
      "source_ids": [
        "bfe-pv-potential-funding"
      ],
      "locator": "Table 6 printed p.40; methods pp.22–23; reference yields Table 5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Generation installation and O&M including allocated inverter replacement; no firm delivery",
      "omissions": [
        "storage/backup",
        "complete system grids",
        "Swiss binding procurement"
      ],
      "uncertainty": "Mixed input vintages: no single defensible price-year conversion; no inflation normalization performed.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "low": 1400,
      "high": 2400,
      "annual_om_chf_kw": 23,
      "annual_yield_kwh_kw": 1150,
      "source_dates": [
        {
          "source_id": "bfe-pv-potential-funding",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2024-12",
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.595552+00:00"
        }
      ]
    },
    {
      "id": "ebp-alpine-PV",
      "technology": "alpine PV",
      "metric": "reference investment assumption",
      "value": 3800,
      "unit": "CHF/kW",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "literature and expert-interview model input",
      "reporting_period": "December 2024 report; inputs from multiple earlier years",
      "source_ids": [
        "bfe-pv-potential-funding"
      ],
      "locator": "Table 6 printed p.40; methods pp.22–23; reference yields Table 5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Generation installation and O&M including allocated inverter replacement; no firm delivery",
      "omissions": [
        "storage/backup",
        "complete system grids",
        "Swiss binding procurement"
      ],
      "uncertainty": "Mixed input vintages: no single defensible price-year conversion; no inflation normalization performed.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "low": 1710,
      "high": 4740,
      "annual_om_chf_kw": 29,
      "annual_yield_kwh_kw": 1450,
      "source_dates": [
        {
          "source_id": "bfe-pv-potential-funding",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2024-12",
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.595552+00:00"
        }
      ]
    },
    {
      "id": "ebp-large-rooftop-PV",
      "technology": "large rooftop PV",
      "metric": "reference investment assumption",
      "value": 1000,
      "unit": "CHF/kW",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "literature and expert-interview model input",
      "reporting_period": "December 2024 report; inputs from multiple earlier years",
      "source_ids": [
        "bfe-pv-potential-funding"
      ],
      "locator": "Table 6 printed p.40; methods pp.22–23; reference yields Table 5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Generation installation and O&M including allocated inverter replacement; no firm delivery",
      "omissions": [
        "storage/backup",
        "complete system grids",
        "Swiss binding procurement"
      ],
      "uncertainty": "Mixed input vintages: no single defensible price-year conversion; no inflation normalization performed.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "low": 830,
      "high": 1120,
      "annual_om_chf_kw": 19,
      "annual_yield_kwh_kw": 950,
      "source_dates": [
        {
          "source_id": "bfe-pv-potential-funding",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2024-12",
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.595552+00:00"
        }
      ]
    },
    {
      "id": "belpmoos-2023",
      "technology": "utility ground PV",
      "metric": "initial development investment budget",
      "value": 30000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "historical project budget",
      "reporting_period": "2023 budget; 2025 revised design",
      "source_ids": [
        "belpmoossolar-budget-design"
      ],
      "locator": "2023-01-13 release and 2025-07-15 update",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "Initial release says up to 35 GWh; update describes original 42 GWh. Preserve this version conflict.",
      "boundary": "Initial project; exact finance and tax scope unstated",
      "omissions": [],
      "uncertainty": "2025 redesign: 23.1 MW/28 GWh instead of 35 MW; updated comparable budget absent. Do not divide old CHF30m by new MW.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "latest_power_mw": 23.1,
      "latest_expected_generation_gwh": 28,
      "source_dates": [
        {
          "source_id": "belpmoossolar-budget-design",
          "publication_date": "2023-01-13; updated 2025-07-15",
          "publication_date_precision": "multiple dates; see value",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T02:00:11.398570+00:00"
        }
      ]
    },
    {
      "id": "gondo-2022",
      "technology": "alpine PV",
      "metric": "initial investment budget",
      "value": 42000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "historical proposed-project budget",
      "reporting_period": "2022 budget",
      "source_ids": [
        "gondosolar-project-news"
      ],
      "locator": "2022-02-07 historical item; 2025-02-07/03-04 revised design/status",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Original project, not final outturn or updated design quotation",
      "omissions": [],
      "uncertainty": "Cost must not be paired with 2025 revised 13 MW design. Last inspected project news says permits/support/PPA/FID still conditional.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "original_power_mw": 18,
      "original_expected_generation_gwh": 23.3,
      "latest_power_mw": 13,
      "latest_expected_generation_gwh": 18,
      "source_dates": [
        {
          "source_id": "gondosolar-project-news",
          "publication_date": "2025-03-04",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:59:50.464131+00:00"
        }
      ]
    },
    {
      "id": "juvent-2013",
      "technology": "wind repowering",
      "metric": "reported total works cost",
      "value": 17000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": 2013,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "operator reported completed works cost",
      "reporting_period": "2013",
      "source_ids": [
        "bkw-juvent-repower-2013"
      ],
      "locator": "2013-11-05 release, second paragraph",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Four replacement 2 MW turbines; existing 16-turbine fleet changes from forecast 40 to 55 GWh/year",
      "omissions": [],
      "uncertainty": "Not an audited full-life cost; prior site/grid reuse; old displaced output not separately quantified.",
      "comparability": "Historical repowering only; never divide CHF17m by entire fleet 55 GWh or call forecast actual output",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "new_turbine_capacity_mw": 8,
      "expected_incremental_generation_gwh": 15,
      "source_dates": [
        {
          "source_id": "bkw-juvent-repower-2013",
          "publication_date": "2013-11-05",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:59:50.464314+00:00"
        }
      ]
    },
    {
      "id": "wind-psi-2017",
      "technology": "wind",
      "metric": "historical Swiss reference LCOE",
      "value": 142,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "2017 model, not current quotation",
      "reporting_period": "2017 reference",
      "source_ids": [
        "psi-lca-costs-2017"
      ],
      "locator": "§8.5.5.2 pp.294–295, Table 8.11",
      "finance": {
        "rate": 0.05,
        "real_or_nominal": "verify original convention before reuse in unified financial model"
      },
      "capacity_factor": 0.2625570776255708,
      "output_basis": "assumed 2300 full-load hours, 1.2% annual degradation",
      "boundary": "CHF2500/kW, 3.3 MW reference; O&M and decommissioning; no storage or grid adaptation",
      "omissions": [],
      "uncertainty": "Historical cost/year mixture. Retained as context; excluded from current-price headline comparison.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "psi-lca-costs-2017",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2017",
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-09T08:49:03.768743+00:00"
        }
      ]
    },
    {
      "id": "kkl-2023-reported",
      "technology": "existing nuclear",
      "metric": "reported accounting production cost",
      "value": 3.8,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2023,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2023",
      "source_ids": [
        "kkl-2023-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9677,
      "annual_cost_chf_million": 368.2,
      "source_dates": [
        {
          "source_id": "kkl-2023-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2023",
          "retrieved_at_utc": "2026-09-09T08:45:22.136678+00:00"
        }
      ]
    },
    {
      "id": "kkl-2023-normalized",
      "technology": "existing nuclear",
      "metric": "normalized accounting production cost",
      "value": 4.73,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2023,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2023",
      "source_ids": [
        "kkl-2023-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9677,
      "annual_cost_chf_million": 458.1,
      "source_dates": [
        {
          "source_id": "kkl-2023-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2023",
          "retrieved_at_utc": "2026-09-09T08:45:22.136678+00:00"
        }
      ]
    },
    {
      "id": "kkl-2024-reported",
      "technology": "existing nuclear",
      "metric": "reported accounting production cost",
      "value": 2.59,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2024,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2024",
      "source_ids": [
        "kkl-2024-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.11",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9636,
      "annual_cost_chf_million": 249.9,
      "source_dates": [
        {
          "source_id": "kkl-2024-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2024",
          "retrieved_at_utc": "2026-09-09T08:45:23.373553+00:00"
        }
      ]
    },
    {
      "id": "kkl-2024-normalized",
      "technology": "existing nuclear",
      "metric": "normalized accounting production cost",
      "value": 4.88,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2024,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2024",
      "source_ids": [
        "kkl-2024-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.11",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9636,
      "annual_cost_chf_million": 470.3,
      "source_dates": [
        {
          "source_id": "kkl-2024-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2024",
          "retrieved_at_utc": "2026-09-09T08:45:23.373553+00:00"
        }
      ]
    },
    {
      "id": "kkl-2025-reported",
      "technology": "existing nuclear",
      "metric": "reported accounting production cost",
      "value": 4.41,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2025",
      "source_ids": [
        "kkl-2025-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9558,
      "annual_cost_chf_million": 422.0,
      "source_dates": [
        {
          "source_id": "kkl-2025-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-09T08:44:31.506267+00:00"
        }
      ]
    },
    {
      "id": "kkl-2025-normalized",
      "technology": "existing nuclear",
      "metric": "normalized accounting production cost",
      "value": 4.9,
      "unit": "Rp/kWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited accounts / normalization calculation",
      "reporting_period": "2025",
      "source_ids": [
        "kkl-2025-full"
      ],
      "locator": "Financial overview and normalized annual cost structure, PDF p.9",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "observed annual net electricity; source dataset preserves GWh",
      "boundary": "Operating partner-company accounts; normalized substitutes 2.75% fund return, not WACC",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Existing asset accounting cost, not selling price, new-build LCOE or guarantee of future cost",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_net_generation_gwh": 9558,
      "annual_cost_chf_million": 468.1,
      "source_dates": [
        {
          "source_id": "kkl-2025-full",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2025",
          "retrieved_at_utc": "2026-09-09T08:44:31.506267+00:00"
        }
      ]
    },
    {
      "id": "kkg-lto-capex",
      "technology": "nuclear life extension",
      "metric": "60-to-80-year incremental investment estimate",
      "value": 1169,
      "unit": "million CHF",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF",
      "geography": "CH",
      "status": "operator estimates with independent uncertainty ranges",
      "reporting_period": "2026-03-12 report",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.5–6 and §2",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Additional 60-to-80-year programme; spend begins at least ten years before year 60; excludes separate investment to reach year 60",
      "omissions": [],
      "uncertainty": "Study did not have detailed operator measures and unit costs; independent generic midpoint CHF1053m per plant.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "low": 1037,
      "high": 1403,
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkg-lto-base",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 46,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "base",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkg-lto-winter-only",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 78,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "winter-only",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkg-lto-closure-after-two-years",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 134,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "closure-after-two-years",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkl-lto-capex",
      "technology": "nuclear life extension",
      "metric": "60-to-80-year incremental investment estimate",
      "value": 732,
      "unit": "million CHF",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF",
      "geography": "CH",
      "status": "operator estimates with independent uncertainty ranges",
      "reporting_period": "2026-03-12 report",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.5–6 and §2",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Additional 60-to-80-year programme; spend begins at least ten years before year 60; excludes separate investment to reach year 60",
      "omissions": [],
      "uncertainty": "Study did not have detailed operator measures and unit costs; independent generic midpoint CHF1053m per plant.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "low": 650,
      "high": 879,
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkl-lto-base",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 44,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "base",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkl-lto-winter-only",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 72,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "winter-only",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "kkl-lto-closure-after-two-years",
      "technology": "nuclear life extension",
      "metric": "incremental-investment break-even wholesale price",
      "value": 104,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "real 2025 CHF output; nominal cash-flow model",
      "geography": "CH",
      "status": "commissioned study scenario",
      "reporting_period": "2026-03-12",
      "source_ids": [
        "bfe-lto-2026-background"
      ],
      "locator": "Summary pp.8–9; Annex B pp.99–108",
      "finance": {
        "nominal_pre_tax_wacc": 0.07,
        "future_inflation": 0.01
      },
      "capacity_factor": null,
      "output_basis": "closure-after-two-years",
      "boundary": "Incremental NPV; operating/fuel/waste costs included, no new construction",
      "omissions": [
        "Additional scheduled decommissioning costs omitted by study mandate, assumes existing funding sufficient at 60 years"
      ],
      "uncertainty": "Early closure includes continuing costs after shutdown; winter-only assumes six months. Safety authorization and future prices remain uncertain.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-lto-2026-background",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": "2026-03-12",
          "reporting_period": "2026 study, real 2025 cost basis",
          "retrieved_at_utc": "2026-09-09T02:11:45.441936+00:00"
        }
      ]
    },
    {
      "id": "hpc-budget-2026",
      "technology": "new nuclear",
      "metric": "forecast completion cost excluding interim interest",
      "value": 35000000000.0,
      "unit": "GBP",
      "currency": "GBP",
      "price_year": 2015,
      "price_basis": "2015 GBP; issuer also estimates around GBP48bn current value",
      "geography": "GB",
      "status": "forecast under construction, not final outturn",
      "reporting_period": "February–July 2026",
      "source_ids": [
        "edf-hinkley-2026",
        "edf-urd-2025",
        "edf-halfyear-2026"
      ],
      "locator": "2025 results Hinkley Point C update; URD project section; 2026 half-year update",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Project completion estimate excludes interim interest; existing CfD/risk arrangements",
      "omissions": [
        "Swiss siting/licensing/labour/grid conversion",
        "Swiss financing quotation"
      ],
      "uncertainty": null,
      "comparability": "Foreign first projects, not Swiss quotation",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_gw": 3.3,
      "source_dates": [
        {
          "source_id": "edf-hinkley-2026",
          "publication_date": "2026-02-20",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:18:07.536116+00:00"
        },
        {
          "source_id": "edf-urd-2025",
          "publication_date": "2026-04-02",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:57:27.801225+00:00"
        },
        {
          "source_id": "edf-halfyear-2026",
          "publication_date": "2026-07-31",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:57:27.801586+00:00"
        }
      ]
    },
    {
      "id": "epr2-budget-2025",
      "technology": "new nuclear",
      "metric": "six-reactor programme budget",
      "value": 72800000000.0,
      "unit": "EUR",
      "currency": "EUR",
      "price_year": 2020,
      "price_basis": "constant 2020 EUR",
      "geography": "FR",
      "status": "forecast programme budget, not tender or outturn",
      "reporting_period": "December 2025 / July 2026",
      "source_ids": [
        "edf-epr2-2025",
        "edf-urd-2025",
        "edf-halfyear-2026"
      ],
      "locator": "Programme cost release; URD financing framework",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Six EPR2 units; support framework includes proposed 60% state loan and CfD; EU review not completed in inspected July release",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Cannot establish unsupported Swiss owner economics; no currency conversion applied",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "edf-epr2-2025",
          "publication_date": "2025-12-18",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:18:07.536204+00:00"
        },
        {
          "source_id": "edf-urd-2025",
          "publication_date": "2026-04-02",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:57:27.801225+00:00"
        },
        {
          "source_id": "edf-halfyear-2026",
          "publication_date": "2026-07-31",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:57:27.801586+00:00"
        }
      ]
    },
    {
      "id": "schoeftland-bess",
      "technology": "battery 2 h",
      "metric": "feasibility project budget",
      "value": 1950000,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "VAT excluded; feasibility estimate",
      "geography": "CH",
      "status": "pre-tender budget",
      "reporting_period": "2025",
      "source_ids": [
        "schoeftland-budget-2025"
      ],
      "locator": "CKW presentation 2025-05-18, costs and project sizing slides",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "Presentation says initial oversizing is intended to preserve 4 MWh at end of 15 years; precise AC/DC and acceptance-test guarantees unavailable",
      "boundary": "Planning, commissioning, battery, cabling, existing MV station connection, civil works, roof, fence and gate; vendor line items not separately priced",
      "omissions": [],
      "uncertainty": "Rounded CHF2m ±20%; original CHF1.95m. AC/DC and acceptance guarantees unverified.",
      "comparability": "Small two-hour Swiss budget; neither pack cost nor four-hour bulk EPC quotation",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_mw": 2,
      "energy_mwh": 4,
      "duration_hours": 2,
      "source_dates": [
        {
          "source_id": "schoeftland-budget-2025",
          "publication_date": "2025-05-18",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T02:10:03.248750+00:00"
        }
      ]
    },
    {
      "id": "mattmark-hydro",
      "technology": "hydro seasonal expansion",
      "metric": "project budget",
      "value": 83000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "conditional project budget",
      "reporting_period": "2025–2026",
      "source_ids": [
        "axpo-mattmark-2025"
      ],
      "locator": "Operator/canton project budget and winter-energy statement; prior hydro expansion register",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Existing water system seasonal shifting, not extra annual natural generation",
      "omissions": [
        "project-specific construction finance",
        "complete O&M/concession/compensation terms"
      ],
      "uncertainty": "Gornerli 435 GWh at 2040; full550 GWh depends on glacier retreat 2045–2060. Moiry40–50 GWh; concession2039. No award of potential support inferred.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "expected_winter_shift_gwh": 60,
      "source_dates": [
        {
          "source_id": "axpo-mattmark-2025",
          "publication_date": "2025-01-16",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:08:17.347557+00:00"
        }
      ]
    },
    {
      "id": "gornerli-hydro",
      "technology": "hydro seasonal expansion",
      "metric": "project budget",
      "value": 510000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "conditional project budget",
      "reporting_period": "2025–2026",
      "source_ids": [
        "alpiq-gornerli-sizing-2026"
      ],
      "locator": "Operator/canton project budget and winter-energy statement; prior hydro expansion register",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Existing water system seasonal shifting, not extra annual natural generation",
      "omissions": [
        "project-specific construction finance",
        "complete O&M/concession/compensation terms"
      ],
      "uncertainty": "Gornerli 435 GWh at 2040; full550 GWh depends on glacier retreat 2045–2060. Moiry40–50 GWh; concession2039. No award of potential support inferred.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "expected_winter_shift_gwh": 435,
      "source_dates": [
        {
          "source_id": "alpiq-gornerli-sizing-2026",
          "publication_date": "2026-05-20",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T01:28:33.041167+00:00"
        }
      ]
    },
    {
      "id": "moiry-hydro",
      "technology": "hydro seasonal expansion",
      "metric": "project budget",
      "value": 120000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "conditional project budget",
      "reporting_period": "2025–2026",
      "source_ids": [
        "vs-moiry-cost-2026"
      ],
      "locator": "Operator/canton project budget and winter-energy statement; prior hydro expansion register",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Existing water system seasonal shifting, not extra annual natural generation",
      "omissions": [
        "project-specific construction finance",
        "complete O&M/concession/compensation terms"
      ],
      "uncertainty": "Gornerli 435 GWh at 2040; full550 GWh depends on glacier retreat 2045–2060. Moiry40–50 GWh; concession2039. No award of potential support inferred.",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "expected_winter_shift_gwh": 40,
      "source_dates": [
        {
          "source_id": "vs-moiry-cost-2026",
          "publication_date": "2026-05-04",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T13:18:07.535577+00:00"
        }
      ]
    },
    {
      "id": "grimsel4-hydro",
      "technology": "pumped hydro expansion",
      "metric": "investment decision budget",
      "value": 300000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "approved investment budget",
      "reporting_period": "2026",
      "source_ids": [
        "kwo-grimsel4-investment-2026"
      ],
      "locator": "Operator release 2026-03-27",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Two84MW reversible units within existing cascade; no new seasonal reservoir energy credit",
      "omissions": [],
      "uncertainty": "Full pump-input power boundary and commercial contracts not disclosed here",
      "comparability": "not a national delivered-cost ranking",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_mw": 168,
      "source_dates": [
        {
          "source_id": "kwo-grimsel4-investment-2026",
          "publication_date": "2026-03-27",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T01:28:31.606947+00:00"
        }
      ]
    },
    {
      "id": "ndd-historical",
      "technology": "pumped hydro",
      "metric": "historical construction cost approximately",
      "value": 2000000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "reported historical construction spend, approximate",
      "reporting_period": "Construction through2022",
      "source_ids": [
        "ndd-operation-2022"
      ],
      "locator": "Commissioning release 2022-06-18",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Site-specific14-year project",
      "omissions": [],
      "uncertainty": "Not repeatable Swiss2026 EPC; current history says over CHF2bn",
      "comparability": "Do not compare CHF100/kWh stored with battery LCOS or annual throughput",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_mw": 900,
      "energy_mwh": 20000,
      "source_dates": [
        {
          "source_id": "ndd-operation-2022",
          "publication_date": "2022-06-18",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T02:10:04.464754+00:00"
        }
      ]
    },
    {
      "id": "ndd-partner-costs",
      "technology": "pumped hydro",
      "metric": "annual partner cost contributions",
      "value": 97524362,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": 2024,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited partner accounts",
      "reporting_period": "2024",
      "source_ids": [
        "ndd-income-2024",
        "ndd-financial-notes-2024",
        "ndd-report-2024"
      ],
      "locator": "2024 income statement; notes1,3; operations report",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Company reimbursement; energy purchase/transport line CHF6.020502m includes own-use and other services",
      "omissions": [],
      "uncertainty": "No reconciled full pumping-electricity invoice/opportunity-cost boundary. Do not divide partner contributions by974GWh and call full LCOS.",
      "comparability": "No merchant profitability or complete LCOS inference",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_discharge_gwh": 974,
      "observed_pumping_gwh": 1176,
      "source_dates": [
        {
          "source_id": "ndd-income-2024",
          "publication_date": "2025",
          "publication_date_precision": "year",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T02:12:35.817447+00:00"
        },
        {
          "source_id": "ndd-financial-notes-2024",
          "publication_date": "2025",
          "publication_date_precision": "year",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T02:14:03.401262+00:00"
        },
        {
          "source_id": "ndd-report-2024",
          "publication_date": "2025",
          "publication_date_precision": "year",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-10T02:10:04.824902+00:00"
        }
      ]
    },
    {
      "id": "ofima-partner-costs",
      "technology": "existing mixed hydro",
      "metric": "annual shareholder cost charges",
      "value": 70760980,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "audited partner accounts",
      "reporting_period": "2024/25 financial year",
      "source_ids": [
        "ofima-annual-2025"
      ],
      "locator": "Conto economico and Relazione finanziaria; Produzione energia table",
      "finance": null,
      "capacity_factor": null,
      "output_basis": "1413.6 GWh shareholder delivery includes pumped generation; pumping input not subtracted from that published delivery denominator",
      "boundary": "Company cost charges include purchased pumping energy and grid use, taxes/concessions, depreciation, finance and shareholder structure",
      "omissions": [],
      "uncertainty": "Not natural-generation-only cost; cannot subtract all129.9GWh from shareholder delivery without reconciling entitlements and costs.",
      "comparability": "Company accounting boundary; no new-project or unit-level LCOE inference",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "observed_shareholder_delivery_gwh": 1413.6,
      "observed_pumping_gwh": 129.9,
      "source_dates": [
        {
          "source_id": "ofima-annual-2025",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": "2024/25",
          "retrieved_at_utc": "2026-09-10T13:08:17.347815+00:00"
        }
      ]
    },
    {
      "id": "hydro-support-2025",
      "technology": "existing hydro",
      "metric": "market premium awarded",
      "value": 19600000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": 2025,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "regulatory award aggregate",
      "reporting_period": "Awards2025 covering economics2024",
      "source_ids": [
        "bfe-hydro-market-premium-2025"
      ],
      "locator": "Factsheet pp.1–2",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Cost shortfall support capped1Rp/kWh; broader revenue/cost recognition from2025",
      "omissions": [],
      "uncertainty": null,
      "comparability": "Transfer, not physical resource cost or evidence all hydro needs subsidy",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "eligible_generation_gwh": 1962,
      "plant_count": 2,
      "source_dates": [
        {
          "source_id": "bfe-hydro-market-premium-2025",
          "publication_date": "2025-11-06",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": "2024 economics; 2025 award",
          "retrieved_at_utc": "2026-09-17T01:59:50.463782+00:00"
        }
      ]
    },
    {
      "id": "ansaldo-reserve-credit",
      "technology": "thermal reserve",
      "metric": "additional commitment credit requested through2030",
      "value": 275000000.0,
      "unit": "CHF",
      "currency": "CHF",
      "price_year": null,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "multi-year procurement/credit announcement",
      "reporting_period": "2025–2030",
      "source_ids": [
        "bfe-reserve-ansaldo-2025",
        "bfe-reserve-current"
      ],
      "locator": "2025-06-25 release; current reserve page",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Recommissioning/readiness transition reserve; targetFebruary2027",
      "omissions": [
        "actual activation fuel/emissions accounting and final outturn"
      ],
      "uncertainty": null,
      "comparability": "Availability service; cannot divide by hypothetical continuous energy to create baseload LCOE",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "power_mw": 250,
      "source_dates": [
        {
          "source_id": "bfe-reserve-ansaldo-2025",
          "publication_date": "2025-06-25",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:59:50.463558+00:00"
        },
        {
          "source_id": "bfe-reserve-current",
          "publication_date": null,
          "publication_date_precision": "unknown",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:59:50.463868+00:00"
        }
      ]
    },
    {
      "id": "capture-pv-q1",
      "technology": "PV",
      "metric": "generation-weighted reference market price",
      "value": 102.66,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q1",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q1, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-pv-q2",
      "technology": "PV",
      "metric": "generation-weighted reference market price",
      "value": 38.96,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q2",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q2, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-hydro-q1",
      "technology": "hydro",
      "metric": "generation-weighted reference market price",
      "value": 117.29,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q1",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q1, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-hydro-q2",
      "technology": "hydro",
      "metric": "generation-weighted reference market price",
      "value": 93.18,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q2",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q2, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-wind-q1",
      "technology": "wind",
      "metric": "generation-weighted reference market price",
      "value": 116.59,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q1",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q1, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-wind-q2",
      "technology": "wind",
      "metric": "generation-weighted reference market price",
      "value": 88.73,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q2",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q2, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-biomass-q1",
      "technology": "biomass",
      "metric": "generation-weighted reference market price",
      "value": 116.67,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q1",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q1, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    },
    {
      "id": "capture-biomass-q2",
      "technology": "biomass",
      "metric": "generation-weighted reference market price",
      "value": 87.79,
      "unit": "CHF/MWh",
      "currency": "CHF",
      "price_year": 2026,
      "price_basis": "not explicitly fixed-price indexed",
      "geography": "CH",
      "status": "official measured-profile market benchmark",
      "reporting_period": "2026-Q2",
      "source_ids": [
        "bfe-market-prices-2026",
        "bfe-market-price-method"
      ],
      "locator": "Quarter Q2, technology table, PDF pp.2–5",
      "finance": null,
      "capacity_factor": null,
      "output_basis": null,
      "boundary": "Swiss day-ahead prices weighted by actual quarter-hour injection of measured cohort; VAT excluded",
      "omissions": [
        "capacity and flexibility value",
        "subsidies/PPA/retail offsets",
        "plant costs"
      ],
      "uncertainty": null,
      "comparability": "Revenue benchmark, not LCOE, complete VALCOE, plant revenue or national generation weighting",
      "converted_value": null,
      "reviewed_at": "2026-09-17",
      "source_dates": [
        {
          "source_id": "bfe-market-prices-2026",
          "publication_date": "2026-07-14",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.615891+00:00"
        },
        {
          "source_id": "bfe-market-price-method",
          "publication_date": "2026-04-10",
          "publication_date_precision": "day",
          "report_date_printed": null,
          "reporting_period": null,
          "retrieved_at_utc": "2026-09-17T01:55:53.625500+00:00"
        }
      ]
    }
  ]
}