  "reviewedAt": "2026-09-18",
  "findings": [
    {
      "id": "demand",
      "recommendation": "Use the central 93.4 TWh end-use case as the provisional 2050 reference. Lower demand requires the stated combination of efficiency and weaker activity; keep growth additions explicit.",
      "sources": [
        "demand-model-v1",
        "demand-scenario-comparison",
        "bfe-data-centres-2026"
      ],
      "locator": "Central/lower/higher 2050 scenario rows; displayed growth and efficiency inputs; data-centre summary.",
      "limitation": "No probability is assigned to the demand cases; the central value is a planning choice, not a forecast.",
      "status": "editorial recommendation"
    },
    {
      "id": "winter",
      "recommendation": "Prioritise safe nuclear, finite hydro and additional winter delivery while retaining trade. Solar and vehicle services complement this supply.",
      "sources": [
        "bfe-electricity-2025",
        "portfolio-2035-model"
      ],
      "locator": "BFE table 5; twelve supply cases and partitions.",
      "limitation": "Seasonal trade is not a measurement of essential imports; the stress results apply to their stated future mixes.",
      "status": "editorial recommendation"
    },
    {
      "id": "hydro",
      "recommendation": "Support delivery of Grimsel 4, development of Grimselsee and a viable Mattmark winter-shift project for their distinct services. Compensate owners for contracted service.",
      "sources": [
        "kwo-grimsel4-investment",
        "kwo-grimsel-milestones-2026",
        "axpo-mattmark-project",
        "owner-model-v1"
      ],
      "locator": "Project records and dates in visual-chapters hydro rows; owner water/opportunity-cost calculations.",
      "limitation": "Conditional project preference, not final permitting or a benefit-cost ranking. Stored energy, seasonal shift and power cannot be added as one energy quantity.",
      "status": "editorial recommendation"
    },
    {
      "id": "storage",
      "recommendation": "Use batteries for short-duration contracted services. Introduce smart charging before relying on bidirectional exports. Keep bulk seasonal lithium-battery storage outside the base plan.",
      "sources": [
        "cost-chapter-calculations",
        "owner-model-v1",
        "v2x-suisse-2024",
        "portfolio-2035-model"
      ],
      "locator": "Battery cycling sensitivities; owner costs and trading benchmark; V2X report pages 3–5; matched vehicle cases.",
      "limitation": "The cycling example is hypothetical; rare reserve availability can still have value. No claim that every short-duration battery project is profitable.",
      "status": "editorial recommendation"
    },
    {
      "id": "nuclear",
      "recommendation": "Pursue Gösgen/Leibstadt extension and owner-led development of a first large reference-based reactor. Use 2047 as the provisional schedule reference, with a 2053-or-later fallback.",
      "sources": [
        "bfe-lto-2026-background",
        "nuclear-delivery-calculations",
        "historical-nuclear-selection"
      ],
      "locator": "Extension summary; delivery planning and delayed cases; historical site dossiers.",
      "limitation": "Editorial planning choice among illustrative schedules. No assigned probability, supplier commitment, present build permission or assured fleet build rate.",
      "status": "editorial recommendation"
    },
    {
      "id": "beznau",
      "recommendation": "Base the earlier supply programme on the announced 2032/2033 retirements. Reconsider further operation only if the owner presents a funded, safe alternative.",
      "sources": [
        "beznau-ensi-operating-horizon",
        "beznau-axpo-decision-faq",
        "nuclear-delivery-calculations"
      ],
      "locator": "ENSI licence horizon; Axpo beyond-2033 assessment; historical output.",
      "limitation": "No legal expiry is inferred. Owner intentions and safety findings can change; the replacement programme continues independently.",
      "status": "editorial recommendation"
    },
    {
      "id": "costs",
      "recommendation": "Prioritise viable existing-reactor extensions; pay hydro and reserve providers for defined services; obtain complete new-nuclear offers with bounded risk allocation.",
      "sources": [
        "bfe-lto-2026-background",
        "cost-chapter-calculations",
        "owner-model-v1"
      ],
      "locator": "Extension cases; cost ledger and comparison contract; owner economics.",
      "limitation": "A recommendation supported by bounded evidence; neither national total cost nor a household tariff has been established.",
      "status": "editorial recommendation"
    },
    {
      "id": "2035",
      "recommendation": "Choose the 26 GWp solar and remaining-reactor package for development. Seek extra supply options against the 2.6 TWh winter/2.3 GW fixed-charging stress screen, and retain the conditional V2G comparison.",
      "sources": [
        "portfolio-2035-model"
      ],
      "locator": "2012-fixed and 2022-fixed; previous plan-procurement claims use V2G cases separately.",
      "limitation": "Preliminary supply-offer brief from two fixed-charging weather cases (2011/12 and 2021/22), 2035 demand, up to 2 GW imports and a 90-winter-day Leibstadt outage of unestimated frequency. Perfect foresight, pooled hydro, no internal grid or probabilistic reserve margin. Not routine annual replacement energy, a final procurement volume or a guarantee of adequacy. No fixed-charging 2023/24 result is available in this edition.",
      "status": "editorial recommendation"
    },
    {
      "id": "strategy",
      "recommendation": "Develop the earlier supply bridge and the new-nuclear programme together. Aim for annual net exports and resilience to restricted imports through commercially viable investments.",
      "sources": [
        "nuclear-delivery-calculations",
        "portfolio-2035-model",
        "owner-model-v1",
        "bfe-monitoring-2025"
      ],
      "locator": "Programme schedules, import sensitivities, owner economics and monitoring targets.",
      "limitation": "The package is a proposed direction with quantified partial tests, not a completed least-cost or sovereign 2050 portfolio.",
      "status": "editorial recommendation"
    }
  ],
  "claims": [
    {
      "id": "plan-fixed-screen-energy",
      "label": "2035 starting energy requirement before contracted vehicle flexibility",
      "value": 2.6,
      "unit": "TWh",
      "status": "scenario",
      "period": "2035 demand with 2011/12 and 2021/22 weather",
      "definition": "Maximum remaining winter energy among the two archived fixed-charging stress cases, rounded upward to 0.1 TWh.",
      "formula": "ceil(max(2555.6857744809754, 2258.7349184467917) / 100) / 10",
      "limitation": "Preliminary supply-offer brief from two fixed-charging weather cases (2011/12 and 2021/22), 2035 demand, up to 2 GW imports and a 90-winter-day Leibstadt outage of unestimated frequency. Perfect foresight, pooled hydro, no internal grid or probabilistic reserve margin. Not routine annual replacement energy, a final procurement volume or a guarantee of adequacy. No fixed-charging 2023/24 result is available in this edition.",
      "sources": [
        "portfolio-2035-model",
        "supply-path-review"
      ],
      "reviewedAt": "2026-09-18"
    },
    {
      "id": "plan-fixed-screen-power",
      "label": "2035 starting power requirement before contracted vehicle flexibility",
      "value": 2.3,
      "unit": "GW",
      "status": "scenario",
      "period": "2035 demand with 2011/12 and 2021/22 weather",
      "definition": "Maximum remaining hourly power gap among the two archived fixed-charging stress cases, rounded upward to 0.1 GW.",
      "formula": "ceil(max(2.28209526160838, 0.7046165785531138) * 10) / 10",
      "limitation": "Preliminary supply-offer brief from two fixed-charging weather cases (2011/12 and 2021/22), 2035 demand, up to 2 GW imports and a 90-winter-day Leibstadt outage of unestimated frequency. Perfect foresight, pooled hydro, no internal grid or probabilistic reserve margin. Not routine annual replacement energy, a final procurement volume or a guarantee of adequacy. No fixed-charging 2023/24 result is available in this edition.",
      "sources": [
        "portfolio-2035-model",
        "supply-path-review"
      ],
      "reviewedAt": "2026-09-18"
    },
    {
      "id": "demand-central-increase-2050",
      "label": "Electricity demand increase in the central 2050 case",
      "value": 35.85364180546513,
      "unit": "TWh/year",
      "status": "scenario",
      "period": "2024 observed baseline to conditional 2050 central case",
      "definition": "Additional annual end-use electricity, before grid losses, storage charging and net exports.",
      "formula": "93.36564180546513 − 57.512 = 35.85364180546513 TWh/year.",
      "limitation": "Inherits the central model assumptions. Additional data-centre, hydrogen, e-fuel and district-heat growth beyond sector assumptions is zero; aviation conversion is excluded. Not a forecast or generation-capacity requirement.",
      "sources": [
        "demand-model-v1",
        "supply-path-review"
      ],
      "reviewedAt": "2026-09-18"
    },
    {
      "id": "plan-fixed-2022-summer",
      "label": "Additional summer electricity in the 2021/22 fixed-charging test",
      "value": 47.46106856163806,
      "unit": "GWh",
      "status": "scenario",
      "period": "April–September portion of the 2021/22 weather case, 2035 demand",
      "definition": "Remaining annual electricity gap less its October–March winter portion.",
      "formula": "2306.1959870084297 − 2258.7349184467917 = 47.461068561638 GWh.",
      "limitation": "Preliminary supply-offer brief from two fixed-charging weather cases (2011/12 and 2021/22), 2035 demand, up to 2 GW imports and a 90-winter-day Leibstadt outage of unestimated frequency. Perfect foresight, pooled hydro, no internal grid or probabilistic reserve margin. Not routine annual replacement energy, a final procurement volume or a guarantee of adequacy. No fixed-charging 2023/24 result is available in this edition. This summer gap is outside the 2.6 TWh winter quantity.",
      "sources": [
        "portfolio-2035-model",
        "supply-path-review"
      ],
      "reviewedAt": "2026-09-18"
    }
  ],
  "fixed_case_ids": [
    "2012-fixed",
    "2022-fixed"
  ],
  "fixed_case_values": [
    {
      "id": "2012-fixed",
      "winter_shortfall_gwh": 2555.6857744809754,
      "unserved_peak_gw": 2.28209526160838
    },
    {
      "id": "2022-fixed",
      "winter_shortfall_gwh": 2258.7349184467917,
      "unserved_peak_gw": 0.7046165785531138
    }
  ],
  "inputs": [
    {
      "path": "data/portfolio-2035-2026-09-18/case-index.json",
      "sha256": "3cb40592b6d3146cd1b990a4324dd3af30d61387154c90523e2edd23656b096d",
      "bytes": 57014
    },
    {
      "path": "data/website-demand-comparison-2026-09-17/comparison.json",
      "sha256": "2343c4c5f50c2963c2f6a3ad011afe78f6538acd5ae9eb0fed96eec7cc43e572",
      "bytes": 32788
    },
    {
      "path": "data/website-nuclear-delivery-2026-09-17/evidence.json",
      "sha256": "47b72acd4b7fe44677db02a3331aeb7005f07eec9a7083da32a8f6f999869ce6",
      "bytes": 22215
    },
    {
      "path": "data/website-visual-chapters-2026-09-17/visuals.json",
      "sha256": "ae1d245b371a2b5269c35136937a9727f5fe97bf28a47453ec34a71a033ee8cf",
      "bytes": 4857
    }
  ]
}