More panels produce more winter energy. They still need complementary supply through nights and poor weather. Our proposal combines economical solar with existing and new nuclear, paid hydro services and explicit backup.

The comparison below asks what a much larger solar fleet would cost. Summer sales can make good roofs competitive, while timing, storage and backup determine the full supply bill.

How large would the solar fleet be?

Solar overbuilding means installing extra panels to obtain more electricity during the weaker part of the year. It also produces more electricity in summer. A BFE-commissioned study explicitly considers this approach.

Winterstrom Schweiz: doubling ordinary PV, printed page 2
Seasonal arithmetic · stated assumptionsA winter energy balance needs a very large solar fleet.Assume solar supplies the winter energy left after hydro. Other generation and imports are omitted from this example.
55 TWhWinter demand
20 TWhAssumed hydro
35 TWhSolar to provide
Sites chosen for winter117.9 GWp

296.9 kWh of winter electricity per kWp of panels.

Site mix built as before135.8 GWp

257.8 kWh of winter electricity per kWp of panels.

Round these capacities to 120 and 140 GWp for the cost examples below. GWp measures rated panel capacity. It does not mean continuous power.

October–March totals. Demand includes grid losses; extra storage losses and curtailment are set to zero. Hydro is an assumption, with no dry-year or owner-delivery guarantee. The published solar profiles use 2004–2018 weather. Finding enough equivalent sites remains a separate constraint.

Published winter yields: Table 3, page 21 · Demand boundary, arithmetic and limitations

The result is a seasonal energy balance. Winter nights and prolonged poor weather still need a supply plan. Reservoirs can save water while solar supplies demand, but their stored energy and turbine power are finite. More nuclear, wind or other winter generation reduces the solar quantity in this example.

Seasonal balance and omitted supply

The 120–140 GWp illustration is neither an official target nor our proposed build programme. Our nuclear-inclusive programme tests 53 GWp alongside existing hydro and two new reactors. It too requires additional winter supply.

Proposed portfolio and remaining requirements

The hourly programme uses a different solar profile, with lower winter yield per installed kilowatt in its selected years. The two fleet capacities therefore need common sites and weather before a matched supply comparison.

Compare the solar profiles and published deployment paths

The two calculations use different solar profiles: this illustration uses published roof and facade portfolios; the hourly programme fits a radiation proxy to five years of Swiss fleet yields. The calibrated 2050 programme assumes less winter electricity from each installed kilowatt. It gives 233–260 kWh per kWp over October–March in its three selected weather years. The published portfolios used here give 258–297 kWh per kWp, using 2004–2018 weather. The capacities need a common site and weather basis before they can form a matched supply comparison.

Calibrated programme winter solar yields Published roof and facade portfolio yields
The wider weather range

The 2035 programme tests thirteen weather years, with calibrated winter yields of 202–260 kWh per kWp. These are potential generation yields before curtailment. These figures describe different input assumptions; they do not demonstrate better sites or improved technology.

Annual solar calibration and sample boundaries

Compare the plans people actually propose

The federal EP2050+ ZERO Basis scenario combines 37.5 GWp solar with other resources and around 9 TWh of winter net imports in 2050. Swissolar proposes 50 GWp. Neither is a solar-only supply plan.

Their demand, trade and generation assumptions differ from ours. Judge each on its winter delivery, cost and credible construction programme. Our larger solar illustration asks a narrower question: how much ordinary solar would match a specified winter energy total when several other sources are excluded?

EP2050+ solar capacity · EP2050+ winter balance · Swissolar programme

What would the extra panels cost?

The Swiss roof-price survey provides a starting point. Its prices vary with installation size and combine offers with invoices. Applying each price to all additional panels shows how much the assumed site mix matters.

Installation alone · constant 2025 CHF, excluding VATThe roof price changes the national bill.Deduct the existing 9.4986 GWp, then price every additional panel at the same assumed installed cost.
120 GWp total fleet140 GWp total fleet

CHF billion · all bars use a 0–250 scale.

  1. Large-roof price · CHF 800/kWp
    120 GWp88.4
    140 GWp104.4
  2. Medium-roof price · CHF 1'428/kWp
    120 GWp157.8
    140 GWp186.4
  3. Small-roof price · CHF 1'911/kWp
    120 GWp211.2
    140 GWp249.4

CHF 158–186 billion at the medium-roof price is one sensitivity. The other rows show how much changes with the installation price.

The survey combines offers and invoices for different roof sizes. These flat-price extrapolations establish neither a feasible site mix nor a confidence interval. Finance, ageing and replacements, roof work, batteries and off-site networks are additional.

Swiss roof-price survey and scope · Installation formulas and all price cases

The cheapest roof price cannot represent every Swiss site. Large, simple roofs are a different opportunity from small roofs, facades and alpine installations. The national potential study includes several such categories. Suitable locations, owners, permits and connections determine how much can actually be built.

Site categories, potential estimates and cost boundaries

The nuclear-inclusive programme also contains substantial solar investment. At the same CHF 1,428/kWp assumption, expanding from 53 to 120–140 GWp adds CHF 95.7–124.2 billion of installation cost. That is a component difference. Each complete portfolio also has its own generation, storage, financing and network costs.

Cost above the shared 53 GWp assumption
Ageing, replacements and the difference between capacity and output

The installation chart prices nameplate capacity after deducting existing panels. It excludes ageing and replacement.

A separate example targets the output of 120–140 GWp of new panels in 2050. It assumes uniform construction, 30-year lives and 0.5% yearly degradation. At CHF 1,428/kWp, gross installation spending becomes CHF 173–204 billion before finance and other excluded works.

These are different targets: installed rated capacity and first-year-equivalent output. The example approximates old panel cohorts from historical net stock growth and assumes no future cost reduction.

Cohort calculation, assumptions and target boundaries

Summer sales can change the comparison

Give summer electricity a realistic value. Assuming it always sells profitably favours overbuilding. Assuming it is always worthless can reject useful projects.

An owner pays for a plant through revenue across the year. The more summer sales contribute, the less winter sales must recover. The following comparison applies this logic equally to solar, wind and nuclear.

Seasonal plant costs · 60 years · 5% return above inflationSummer sales change what winter electricity must earn.The remaining plant cost is spread over potential winter production. Both summer assumptions apply equally to solar, nuclear and wind.
No summer revenueCHF 50 net per potential summer MWh

2025 CHF per MWh of potential winter output · common scale 0–800. Additional hourly balancing and off-site networks are excluded.

  1. Large roof · CHF 800/kWp
    No credit302
    CHF 50166
  2. Commercial roof · CHF 1,102/kWp
    No credit386
    CHF 50250
  3. Small roof · CHF 1,911/kWp
    No credit651
    CHF 50515
  4. Alpine study reference
    No credit482
    CHF 50416
  5. Madrisa project budget
    No credit782
    CHF 50707
  6. New nuclear reference
    No credit216
    CHF 50175
  7. Grenchen wind budget
    No credit173
    CHF 50148

Cheap roofs can compete on seasonal energy costs. Their advantage depends on selling useful output, including in summer. These bars price plant energy, with no guarantee of delivery during a particular hour.

What is counted, and why the inputs differ

The chart compares a constant 2025 CHF scenario over 60 years from first commissioning. It includes financing, upkeep, solar/wind replacement after 30 years, assumed removal costs and 0.5% yearly solar degradation. Reference solar upkeep includes inverter replacement.

Solar prices draw on roof surveys and site-type assumptions. Madrisa and Grenchen use owner budgets and forecast full-project production. The nuclear reconstruction uses Axpo reference assumptions, including CHF2024 8,530/kW before construction finance, 85% output, a 55% winter share and a refurbishment. Fuel, waste/decommissioning provisions and an additional provisional insurance allowance are included.

The Axpo inputs use a 1.002 consumer-price conversion to 2025 money. Other mixed-date reference inputs and project budgets are carried at their printed values as explicit 2025-price assumptions. Those conventions do not make them supplier quotations.

The summer allowance is net revenue divided by all potential summer output, including unsold electricity. Winter output is assumed fully useful. Actual timing, curtailment, owner contracts and supply reliability require hourly calculation.

This nuclear reference differs from the separate 2050 programme owner budget. The source assumptions and cost scopes remain distinct.

Financial assumptions · All seasonal comparisons · Cost, lifetime and delay sensitivities

Reconstructed plant cashflows and limitations · Nuclear reference: Table 7, page 58 · Solar reference yields and upkeep

The cheap-roof and nuclear examples reach the same seasonal cost at about CHF 45 of net value per potential summer MWh. This uses a 5% required return above inflation and the stated plant costs. Economical roofs can therefore compete on this measure.

Equal-cost summer-value calculation

“Net value per potential MWh” spreads summer receipts over everything the plant could generate, including output left unsold. For example, selling half at CHF 100/MWh gives CHF 50 per potential MWh before any other deductions. Exports, local use, losses and curtailment—the deliberate reduction of output—determine the actual value. Neither unlimited export income nor zero summer income is established for a national fleet.

Summer-value definition and illustrative arithmetic

Nuclear also needs cost discipline and credible delivery. Raising its construction input to CHF 15,000/kW in 2024 money and its build period to 15 years raises the no-summer-credit result to about CHF 365/winter MWh. That uses the same 5% return. Replacement supply during a delay adds a separate system cost.

Nuclear construction-cost and duration sensitivity

Choose winter projects by the service they deliver

Alpine solar · operating and expanding

Madrisa supplies winter power as construction continues

Measured: the owner reports 1.5 GWh during its first partial winter, from slightly more than 2 MW.

First-winter production

Connected by mid-September 2026: around 10'000 modules, or almost 6 MWp. This is rated power; output varies with sunlight.

Full-project forecast: about 17 GWh a year, with full commissioning targeted for autumn 2027.

EKZ: connected capacity and completion target

The reported CHF 70 million budget covers the full project. One partial winter gives useful evidence, but cannot establish a national yield.

Full-project budget
Wind · proposed project

Grenchen merits a place in the comparison

The owner expects about 30 GWh a year, roughly two-thirds in winter, at a CHF 34 million budget.

Planned operation in 2029 remains conditional. The owner reports that construction must await the Federal Supreme Court decision. These figures are a project forecast.

Current plan, budget and procedural status

Prioritise economical roofs and viable winter wind; require expensive installations to justify their additional service. An alpine plant’s winter share alone does not settle its value. Compare its full cost, timing, connection and likely sales. The finite number of viable wind and solar sites also limits national extrapolation.

Storage has a different job and a separate bill

Generation creates electricity. Storage moves it to another hour or season, using energy that must first be available. The examples below therefore belong beside the generation comparison, with their own service and cost boundaries.

Batteries: pay for usable energy and power. An illustrative 40 GWh four-hour fleet has 10 GW of discharge power. At the assumed CHF 250–500 per usable kWh, initial purchase costs CHF 10–20 billion. Four hours of delivery can cover a short gap if enough charging energy is available. It cannot replace winter generation for weeks without recharging.

Battery operating cost, charging and lifetime assumptions

With 300 full cycles yearly, our example costs CHF 149–263 per MWh discharged, including charging. That assumes a 15-year life, 5% return, maintenance including augmentation, 85% round-trip efficiency and CHF 30/MWh charging electricity. The 40 GWh quantity is an illustration; hourly supply needs must determine a purchased fleet’s size and cycling opportunities.

Battery purchase and service calculations Life, efficiency and upkeep conventions

Hydro: pay for the winter shift and the sales forgone. Grimselsee’s owner budget is CHF 307 million for about 240 GWh of extra seasonal shifting. Our example requires roughly CHF 108 per shifted MWh: capital recovery, assumed upkeep and CHF 30/MWh of summer sales forgone. It assumes one full shift each year over 60 years at a 5% return. The project moves a finite quantity of water energy into winter; annual natural-water generation does not rise by the shifted amount. Owners need voluntary, viable contracts and respect for their operating obligations.

Project budget and seasonal shift Capital recovery and owner compensation

Network costs also need a fair allocation. Existing-asset renewal and the connections for electrified heating and transport serve several portfolios. Charge each proposed mix for its additional requirements. Assigning the whole national grid programme to solar would overstate its incremental cost.

Demand, generation and renewal in the grid scenarios
Calculation files and the remaining comparison

The seasonal tables include plant lifetimes, replacement, upkeep, degradation and finance. They assume winter output is useful. A national comparison must additionally locate buildable sites, use hourly profiles, respect hydro constraints and derive storage, backup and network requirements.

The solar-heavy example and the 2050 nuclear-inclusive programme have different supply boundaries. Their plant totals cannot establish a whole-system winner. Private supplier offers, owner contracts and future sales remain explicit assumptions where unavailable.

Calculation method · Chart data and claims · Source catalogue · Common comparison requirements · Remaining gaps · Calculations and inputs (ZIP; original source archives excluded)

Continue to the backup and delivery services that keep the country supplied.

References

  1. Madrisa Solar: Bereits die Hälfte der Anlage am Netz
    EKZ · 2026-09-25
  2. Winter supply, lake access and nuclear fleet comparisons
    WattInfo · Calibrated hourly scenarios, 26 September 2026
  3. Import reliance, winter solar inputs and forced shortages
    WattInfo · Archived-input calculations, 25 September 2026
  4. Programme assumptions, dispatch choices and cost scope
    WattInfo · Archived-input interpretation, 25 September 2026
  5. Winter solar: capacity, seasonal costs and paid storage
    WattInfo · Conditional component comparison, 22 September 2026
  6. Winterstrom Schweiz
    BFE / EnergieSchweiz commissioned research · 2021-01-25
  7. Swiss rooftop solar installation prices in 2025
    Planair SA for EnergieSchweiz/BFE · 2025 offers and invoices; report dated 3 August 2026
  8. Swiss solar and associated storage statistics for 2025
    Swissolar for BFE · Reference year 2025; report dated 9 July 2026
  9. PV incentives and usable potentials
    BFE / EBP · 2024-12
  10. Axpo nuclear energy report
    Axpo · Archived edition reviewed 22 September 2026
  11. Madrisa Solar project, costs and programme
    EKZ / Madrisa Solar AG · Archived edition reviewed 22 September 2026
  12. Madrisa first-winter production
    EKZ · 2026-03-31
  13. Windpark Grenchenberg, current owner page
    SWG · Archived edition reviewed 22 September 2026
  14. KWO Grimselsee expansion
    Kraftwerke Oberhasli AG · Archived edition reviewed 22 September 2026
  15. Utility-scale battery2025ATB
    National Laboratory of the Rockies · 2025
  16. Electrification and renewable expansion: Swiss distribution grids
    BFE / Consentec / EBP / Polynomics · 2022-11-10
  17. WattInfo electricity programme: 66 hourly cases, delivery dates and owner finance
    WattInfo · Conditional programme, 19 September 2026
  18. Energieperspektiven 2050+: Kurzbericht
    Prognos / TEP Energy / INFRAS for BFE · 2020-11
  19. Energieperspektiven 2050+: Exkurs Winterstrom
    Prognos / INFRAS / TEP Energy / Ecoplan for BFE · 2021-10-13
  20. 50 Gigawatt Photovoltaik bis 2050 – welche Anlagen braucht es?
    Swissolar · 2022-11-30

Find definitions, calculations and model inputs in the source register.